Long-span glulam structures: beams, arches and column-free spaces

A room without intermediate columns changes how a space can be used and organised. Glued laminated timber, or glulam, allows beams, frames and arches to be designed for public buildings, production facilities and residential architecture with particular requirements.

A clear long span works when geometry, connections and erection are designed together.

The choice involves more than the length of a beam. Long-span glulam structures require structural form, supports, deflection and construction stages to be considered together. In Ticino and Switzerland, access and site conditions can influence the solution just as much as the architectural design.

Space, use and structural geometry

A straight beam, an arch and a frame transfer loads to their supports through different mechanisms. Geometry must be chosen alongside the arrangement of openings, clear height and the position of vertical structures. With arches, for example, the horizontal reactions must be accommodated by the designed system.

The choice becomes clearer by starting with how the space will be used: a sports facility, a workshop and a panoramic living room require more than different spans. Suspended loads, acoustic requirements, daylight distribution and the possibility of intermediate supports also change. Bringing these factors together on the same drawing allows genuinely equivalent alternatives to be compared. A deeper beam may simplify a connection but clash with a service duct or reduce headroom precisely where uninterrupted space is needed.

Supports and comparison of structural systems

An arch should not be chosen solely for its profile. It is essential to understand how its thrust is restrained and how much space its supports and connections need. Foundations and the structures below therefore form part of the assessment. Clients benefit from an explanation of the load path: where loads originate, which elements they pass through and where they reach the ground. This makes the difference between an attractive shape and a buildable structural solution understandable.

Glulam offers considerable freedom of form, but its cross-section and material grade are determined by structural calculations. An acceptable span cannot be inferred from a photograph of another building.

Cost comparisons should also include secondary components, connections and erection. Geometry that reduces the number of columns may require more substantial foundations or joints; dividing a component can simplify transport but add work at height. Timber volume alone therefore does not describe the cost of the complete system. Presenting alternatives with the same spatial and performance requirements helps clients understand where value lies and what practical consequences accompany each choice, keeping the estimate connected to buildability.

Deflection, vibration and lateral stability

A structure may have adequate strength yet still deflect in ways incompatible with glazing, partitions or roofing. The designer considers deflection, long-term effects and, where relevant, vibration and the sensitivity of connected components. The conditions of use give these results their meaning. The lateral stability of beams and wind actions also require attention. Bracing and connections between elements help maintain the intended geometry; they are not accessories to add once erection has begun.

Deflection must be assessed against what the structure supports, rather than against an isolated limit alone. A glazed façade may need joints that accommodate movement; a roof build-up must retain its intended drainage even after loads are applied. The designer assesses immediate and long-term behaviour, taking environmental conditions and the restraint system into account. This assessment guides cross-sections, any specified precamber and junction details.

The intended use can also change which checks matter most. A mezzanine occupied by people, for example, raises different questions from an inaccessible roof. A solution should therefore not be transferred automatically from one building to another. Suspended services, future partitions and possible changes of use should be flagged during early discussions. Any required reserve capacity is assessed in the design, so that a future possibility does not become an additional load imposed without checking.

Accessible, protected and inspectable connections

Plates, dowels and screws must transfer forces with defined spacing and geometry. Where timber remains exposed, connection protection, tolerances and inspection access must also be coordinated. A concealed connection is not automatically simpler than an exposed one. Fire protection concerns the combined cross-section, connections and construction layers. Service shafts and penetrations must be planned without compromising load-bearing areas; later holes require a specific assessment.

A good detail also shows how the installer will reach the connection. Space is needed to insert components, access for tools and a sequence that leaves the final fixings reachable. Checking may require a sample or workshop trial assembly, especially where a connection is repeated many times. The benefit is not merely visual: discovering a clash before delivery allows the drawing to be corrected without improvised work on a suspended beam.

Where steel and timber remain exposed, the connection must also avoid pockets where water can collect. Protection in roofed but open-sided spaces differs from that in a dry internal room. Exposure, metal finishes and inspection arrangements must be clear. Even a decision to conceal a plate must leave responsibilities clear: who makes the connection, who checks its installation and which photographs document it before covering up.

Transport and division into components

A very long or curved element has to reach the site, be unloaded and rotate within the available space. The road route, transport envelope, supports on the vehicle and crane capacity are checked before production is confirmed. Where a structure must be divided, joint positions are chosen through structural design, not simply to suit the lorry. Logistics helps identify a feasible system without replacing connection checks.

Logistical assessment must cover the entire route, not stop at the property entrance. A hairpin bend, a sloping road or an overhead line can affect the vehicle required. On site, the bearing capacity of working platforms and the position of outriggers matter and must be assessed with those organising the lift. The crane radius changes during the manoeuvre: being able to reach the support does not prove that every stage of movement is compatible with the selected equipment.

If a component is divided, the design must coordinate the joint with the stage when it will be completed. A connection accessible at ground level may become difficult to finish above an already erected wall. Discussions between manufacturer, engineer and installation team must therefore take place early. Transport in several parts, preassembly or a different sequence can be considered, but every alternative requires an overall assessment of stability, tolerances and inspection access, without arbitrary changes to the structural system.

Lifting and temporary stabilisation

During lifting and before bracing is complete, a beam may experience conditions different from those in its final position. Lifting points, lifting equipment and temporary stabilisation must suit the component and the planned sequence.

The erection plan must clearly distinguish the moment an element bears on its supports from the moment it can be released. Permanent connections may not yet be complete and secondary elements may arrive with the next delivery. The necessary temporary restraints and who may authorise their removal must therefore be specified. Manoeuvring areas remain separate from pedestrian routes; working beneath a suspended load or using the crane to force alignment is not an acceptable solution.

Documentation and the quality of the finished space

At completion, measurements, connection checks and updated drawings are collected. This documentation also serves those who will install services or finishes: they need to know where not to drill and which parts must remain accessible. The quality of a long-span glulam structure can thus be recognised on two levels: the space achieved and the decisions that make it reliable. In Ticino, where access and the terrain of building plots can be complex, linking design with erection has particularly practical significance.

For Project Evolution, bringing structural calculations, supply and installation together allows these aspects to be addressed from the earliest stages. The aim is to achieve the required clear space with buildable connections and verifiable erection stages, avoiding improvised structural changes at height.

Frequently asked questions

What does a long span mean?

The clear distance between supports. There is no single figure valid for every system: geometry, loads and requirements in use determine the design.

Can glulam be curved?

Yes. Arches and shaped elements require specific design of their form, manufacture, supports and handling.

Does a deeper beam always solve the problem?

No. Lateral stability, connections, deflection and compatibility with other building components must also be checked.

Can long-span structures be prefabricated?

Yes, but dimensions and division into components also depend on transport, crane access and the scope for assembly on site.

Can services pass through beams?

Only where provided for and verified in the design. An unauthorised hole can affect a structurally important area.

When is temporary bracing specified?

As part of the erection plan, before components are delivered and lifted.